Glebe, NSW, in the City of Sydney, is a suburb of Victorian terraces, semis and converted cottages, housing stock old enough that asbestos-containing materials, fibro additions, eaves, linings, pipe lagging, are common. Removing them is licensed, regulated work, and the two things that most reliably tell you a job will be done properly are a licence you can check and a clearance process that is correctly independent. Eco Demolition is a family-operated, licensed asbestos removal contractor covering Glebe; we publish our Asbestos Removal Licence, AD212242, and if you are comparing asbestos removal contractors in Glebe, that published number is the differentiator worth starting from.

4.9
Customer Rating
0
Years Experience
0
Projects Completed
ISO-Certified / EPA NSW Compliant / Safework NSW Compliant

Trusted by Public Sector Clients

Licensed Demolition Contractor | Licensed Asbestos Removal | Residential, Commercial & Development Projects | SafeWork & EPA Compliant | Fully Insured

Asbestos Removal Glebe: Test, Remove and Dispose, End to End

Asbestos classes and what each one requires

Asbestos work in NSW is regulated by SafeWork NSW under the Work Health and Safety Regulation 2017. Friable asbestos (loose, crumbly) is Class A and needs a Class A licence for any amount; non-friable (bonded) fibro is Class B. Eco Demolition holds the capability for both and publishes AD212242, and this is the open flank in Glebe: none of the organic pages ranking for the suburb publish a licence number. Class A is capability, not exclusivity, we do not claim to be the only ones who hold it, but a checkable licence number and a correctly-documented process are a genuine, verifiable edge.

About the team at Eco Demolition

Established in 2015 and run by founder Adam A. Abbas with a family team of nine, Eco Demolition has completed more than 1,000 projects across Sydney. We do the work properly, safely, and once, with the full credential set on our Sydney friable asbestos removal service.

Asbestos Removal Glebe: Test, Remove and Dispose, End to End

The compliant removal process, correctly attributed

  1. Inspection and identification, with sampling where needed.
  2. SafeWork NSW notification before licensed work begins, a five-day lead time.
  3. Containment for friable work, sealed enclosure, negative air pressure, HEPA filtration and wetting.
  4. Air monitoring during the works.
  5. The clearance certificate confirming safe reoccupation.
  6. EPA-compliant transport and disposal with tipping dockets.

The point worth being precise about, and where some pages that mention “clearance” stay vague, is who does it. For friable (Class A) work, the air monitoring and clearance certificate are carried out by an independent licensed asbestos assessor, a distinct role from the removalist. We arrange and coordinate that independent assessor and never issue the clearance ourselves. Naming the role correctly is not pedantry; it is the difference between a compliant job and one that marks its own work.

Why classification comes first

Most asbestos in a Glebe terrace is bonded and stable while intact, but bonded material can become friable when damaged, aged, weathered, fire-affected or water-blasted, and friable material needs Class A handling. A site inspection determines the class before the work is scoped, kept factual and grounded in the suburb’s housing stock, not in anything alarmist.

Asbestos Removal Glebe: Test, Remove and Dispose, End to End

What is included, and the single-team advantage

For Glebe we cover an asbestos inspection report, licensed friable and non-friable removal, asbestos roof removal, and safe transport and compliant disposal. Where the asbestos is in a house due for demolition or a rebuild, one contractor handling identification, containment, removal, arranged independent clearance and the demolition is the advantage a specialist-only firm cannot match, our Chatswood fibro-house project ran that way. We also handle demolition in Glebe.

Pricing, without surprises

We publish no dollar figures or per-square-metre rates; a compliant Glebe quote depends on the material, its condition, the volume and access. A proper quote covers licensed removal, arranged independent air monitoring and clearance for friable work, and EPA-compliant disposal, as a fixed price under our Fixed Price Guarantee. The quote is free.

Areas We Serve
Other Services Available in Glebe

Asbestos FAQs for Glebe

Process and regulator-derived, from SafeWork NSW and NSW WHS Regulation 2017.

Who actually issues the clearance certificate?

For friable work, an independent licensed assessor we arrange and coordinate, separate from us as the removalist. We do not self-issue it, and you should be wary of any removalist who says they do.

Which council is Glebe in?

The City of Sydney. Asbestos removal, though, is regulated by SafeWork NSW and the NSW EPA rather than by council.

Can I remove asbestos myself?

For non-friable asbestos, up to 10 square metres may be removed by an owner-occupier without a licence if handled correctly; friable asbestos, and larger jobs, need a licensed removalist.

Talk to us about Glebe asbestos

A Published Licence, a Documented Chain. That is what Glebe gets from us.

For licensed asbestos removal in Glebe with a published licence and a correctly-documented clearance, call Eco Demolition on 02 9769 0050, Monday to Friday 7am to 7pm, for a free, fixed-price quote.

Just Some of the Builders We Work With

Clarendon
Clover
Edenbraehomes Logo
Fairmont Homes Nsw Logo
Lily
Masterston
Montgomery
Hall & hart
Mcdonald Jones
Mericon
Wisdom Homes
Rawson
Sekisui
Eco Demolition

Start Your Demolition & Asbestos Removal Project Today

Get your free fixed-price quote within 24 hours.

    Upload File

    Supported formats: JPG, JPEG, PNG, PDF. Max file size: 10 MB.

    This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

    We value your privacy. Your information will only be used to prepare your quote.