Behind most Blakehurst demolition jobs is a rebuild. Around this corner of Sydney's St George area, the demolition records are almost all knockdown-rebuilds: an old house down, a new one up, and often a swimming pool or basement to clear as part of the same job. Eco Demolition, a family-run business established in 2015, handles the lot as one licensed contractor: the Georges River Council approval, the asbestos, the demolition and the excavation, through to a level, construction-ready block. We work across Blakehurst and the wider St George area as demolition contractors, and quote the whole job as one fixed price, so you are not left stitching three separate trades together.
Trusted by Public Sector Clients
Licensed Demolition Contractor | Licensed Asbestos Removal | Residential, Commercial & Development Projects | SafeWork & EPA Compliant | Fully Insured
Getting a Blakehurst demolition approved through Georges River Council
A demolition in Blakehurst is assessed by Georges River Council, the consent authority for this part of Sydney’s St George area, under the current Georges River Local Environmental Plan 2021 and Development Control Plan 2021. These replaced the older Kogarah planning instruments, so it is worth checking that any advice you are working from refers to the current plans. Which approval you need depends on the property and the scope, not the suburb, and there are three routes.
Some minor work is exempt development and needs no application at all, as long as it meets every condition in the State planning rules. Many straightforward house demolitions can run as a Complying Development Certificate, or CDC: a faster, code-based approval that an accredited certifier or the Council can issue when the job meets the State’s complying development codes. Anything outside those codes, such as a heritage-listed property, environmentally sensitive land, or a site whose constraints push it past the standards, needs a full Development Application, or DA, assessed by Georges River Council.
Both routes are live around Blakehurst, with local demolitions approved on each in the Council’s register. Depending on the site, a DA may call for reports or conditions a CDC would not. We work out which pathway your job needs, prepare the documents and manage the lodgement.
Knockdown-rebuild demolition, pool removal and site preparation
A Blakehurst knockdown-rebuild sets the pace for everything after it: the demolition has to leave a clean, level, construction-ready block. We take the old house down safely, disconnect and cap the services, remove the slab and footings, and where the plans call for it, take out the swimming pool and excavate for a basement or new slab, all under the one contract.
Across Blakehurst and the St George area, we take on:
- Full house demolition and knockdown-rebuild site preparation
- Partial and selective demolition where part of the building stays
- Internal strip-outs, and office or shop strip-outs for commercial tenancies
- Swimming pool removal and site restoration
- Shed, garage and outbuilding removal
- Site clearing, bulk excavation and earthworks for the new build
Eco Demolition at a glance
Eco Demolition is a licensed demolition and asbestos removal contractor, family-run and led by founder Adam A. Abbas. Since starting out in 2015, it has completed more than 1,000 projects across residential, commercial and government sites. As demolition contractors working the St George area, we hold current demolition and asbestos removal licences and carry full insurance; the licence numbers, ISO accreditations, insurance cover and customer reviews sit on our main Sydney demolition service. On a Blakehurst job, what matters is simpler: one licensed team runs the work from approval to handover, with a single point of contact throughout.
Asbestos: inspected and removed before the structure comes down
If your home was built before the 1990s, it may contain asbestos, commonly in fibro sheeting, eaves, cement pipes or old floor backing. It has to be handled before the structure comes down, not during, so every demolition begins with a pre-demolition inspection to identify asbestos and other hazardous materials.
Where asbestos is present, our licensed removalists take it out first, under SafeWork NSW and NSW EPA rules, for compliant disposal at a licensed facility. It comes in two forms: non-friable, bonded into solid sheeting, and friable, which is loose or crumbling and controlled far more strictly. Friable asbestos must be removed by a Class A licensed removalist; we hold that licence, and for this work the air monitoring and clearance certificate are issued by an independent licensed assessor we arrange and coordinate, never sign off ourselves. Only once the site is cleared and certified does structural demolition begin.
What else a demolition needs before work starts
Approval is only part of getting a site ready. A few other steps catch owners out:
- A waste management plan: Georges River Council expects demolition and construction waste to be planned for, so material is sorted, recycled where it can, and sent to licensed facilities. We prepare it as part of the job.
- Service disconnections: electricity, gas, water, sewer and telecommunications all have to be disconnected and made safe before work starts.
- Protected trees: if a tree on or near the site is protected, removing or pruning it can need separate approval.
- Footpath or road occupancy: where a skip, hoarding or machine has to sit on the footpath or road, a permit may be required.
None of it should land on you to chase: we identify what applies at the site assessment and fold it into one scope and one price.
Pricing a Blakehurst demolition
There is no square-metre rate for demolition, because no two sites are the same. What shapes your price is the size and construction of what is coming down, whether asbestos is present, how much room a truck and machine have to reach the site, whether a pool or basement has to be excavated, the approval pathway, and the volume of waste to be carted away.
So we come out, look at your actual site, and put one fixed price in writing. Under our Fixed Price Guarantee, the price we quote is the price you pay, with no hidden extras once work is under way, unless you change the scope. The quote is free.
How your Blakehurst demolition runs in order
One team handles every stage, so you always know what comes next:
- Initial contact and a free, fixed-price quote.
- A free site assessment of the structure, access, asbestos and site conditions.
- Council approvals and permits, managed for you.
- Licensed asbestos removal and site preparation, cleared before demolition.
- The demolition itself, carried out safely and to schedule, with progress updates.
- Waste removal, sorting and site clean-up, recycling what we can.
- Final compliance certificates and a construction-ready handover.
Where a demolition affects the neighbours, we door-knock beforehand to explain what to expect and when.
- Demolition Allambie Heights
- Demolition Annandale
- Demolition Auburn
- Demolition Balgowlah
- Demolition Balmain
- Demolition Banksia
- Demolition Baulkham Hills
- Demolition Beecroft
- Demolition Bellevue Hill
- Demolition Beverly Hills
- Demolition Bexley
- Demolition Blacktown
- Demolition Blakehurst
- Demolition Bondi
- Demolition Botany
- Demolition Brookvale
- Demolition Burwood
- Demolition Cammeray
- Demolition Camperdown
- Demolition Canterbury
- Demolition Caringbah
- Demolition Carlingford
- Demolition Carss Park
- Demolition Castle Cove
- Demolition Castle Hill
- Demolition Castlecrag
- Demolition Chatswood
- Demolition Chatswood West
- Demolition Cheltenham
- Demolition Cherrybrook
- Demolition Clontarf
- Demolition Clovelly
- Demolition Collaroy
- Demolition Como
- Demolition Concord
- Demolition Concord West
- Demolition Connells Point
- Demolition Coogee
- Demolition Cronulla
- Demolition Croydon
- Demolition Croydon Park
- Demolition Dee Why
- Demolition Denistone
- Demolition Dover Heights
- Demolition Dundas
- Demolition Dundas Valley
- Demolition Dural
- Demolition East Killara
- Demolition East Lindfield
- Demolition Eastwood
- Demolition Engadine
- Demolition Enmore
- Demolition Epping
- Demolition Ermington
- Demolition Five Dock
- Demolition Forestville
- Demolition Frenchs Forest
- Demolition Freshwater
- Demolition Gladesville
- Demolition Glebe
- Demolition Gordon
- Demolition Greystanes
- Demolition Guildford
- Demolition Gymea
- Demolition Homebush
- Demolition Hornsby
- Demolition Hunters Hill
- Demolition Hurstville
- Demolition Kensington
- Demolition Killara
- Demolition Killarney Heights
- Demolition Kings Langley
- Demolition Kogarah
- Demolition Lane Cove
- Demolition Lane Cove West
- Demolition Lidcombe
- Demolition Lilyfield
- Demolition Lindfield
- Demolition Liverpool
- Demolition Manly
- Demolition Maroubra
- Demolition Marsfield
- Demolition Mascot
- Demolition Matraville
- Demolition Meadowbank
- Demolition Melrose Park
- Demolition Merrylands
- Demolition Mosman
- Demolition Narrabeen
- Demolition Neutral Bay
- Demolition Normanhurst
- Demolition North Balgowlah
- Demolition North Manly
- Demolition North Narrabeen
- Demolition North Ryde
- Demolition North Willoughby
- Demolition Northbridge
- Demolition Northern Beaches
- Demolition Northmead
- Demolition Oyster Bay
- Demolition Parramatta
- Demolition Peakhurst
- Demolition Pendle Hill
- Demolition Penrith
- Demolition Point Piper
- Demolition Pymble
- Demolition Ramsgate
- Demolition Randwick
- Demolition Rose Bay
- Demolition Rosebery
- Demolition Ryde
- Demolition Sans Souci
- Demolition Seven Hills
- Demolition Silverwater
- Demolition St Ives
- Demolition St Marys
- Demolition Strathfield
- Demolition Sutherland Shire
- Demolition Sutherland
- Demolition Sylvania Waters
- Demolition Sylvania
- Demolition Tempe
- Demolition Toongabbie
- Demolition Turramurra
- Demolition Vaucluse
- Demolition Warriewood
- Demolition Wentworthville
- Demolition West Ryde
- Demolition Winston Hills
- Demolition Woollahra
Demolition questions in Blakehurst
In most cases, yes, though not always a full Development Application. Some minor work is exempt, many house demolitions can run as a Complying Development Certificate, and heritage-listed or constrained sites need a DA assessed by Georges River Council. We work out which applies to your address and handle the paperwork.
A Construction Certificate covers the building work that follows, not the demolition itself, which is approved through a CDC or a DA. If you are demolishing to rebuild, your builder will need a Construction Certificate for the new dwelling before construction starts.
The contractor does. Demolition work in NSW must be carried out by an appropriately licensed demolisher, and any asbestos removed by licensed removalists. We hold current demolition and asbestos removal licences; the numbers are published on our main Sydney demolition service.
Often, yes. Where a knockdown-rebuild is approved as a single development, the demolition and the new dwelling are consented together, as in local Blakehurst approvals. We can take the demolition, the pool or basement excavation and the site preparation as one contract, and hand the block over ready for the builder.
Speak to a Blakehurst demolition contractor
Blakehurst knockdowns and strip-outs, taken to a construction-ready block.
Eco Demolition works across Blakehurst and the neighbouring St George suburbs, from Carss Park and Connells Point through to Kogarah, Hurstville, Bexley and Sans Souci. For a knockdown-rebuild, a strip-out or a straight site clear, one licensed team carries it from the Georges River Council approval through to a block that is ready for the builder, at the fixed price we quote up front. Call 02 9769 0050 for a free quote on your Blakehurst demolition.
Just Some of the Builders We Work With
Start Your Demolition & Asbestos Removal Project Today
Get your free fixed-price quote within 24 hours.
We value your privacy. Your information will only be used to prepare your quote.