Before you line up quotes for a demolition in Clovelly, it pays to know who signs the job off. For a property here, that authority is Randwick City Council, which assesses demolition under the Randwick Local Environmental Plan 2012. Getting the consent authority right from the start is what keeps an approval moving, and it is the first thing we confirm. Eco Demolition is a family-run, licensed demolition contractor, and we manage the Randwick approval pathway from the first site assessment to a construction-ready block.

4.9
Customer Rating
0
Years Experience
0
Projects Completed
ISO-Certified / EPA NSW Compliant / Safework NSW Compliant

Trusted by Public Sector Clients

Licensed Demolition Contractor | Licensed Asbestos Removal | Residential, Commercial & Development Projects | SafeWork & EPA Compliant | Fully Insured

Demolition Clovelly, NSW: Contractors and the Randwick City Council Approval Path

Which council approves a demolition in Clovelly?

Not every demolition needs a development application. In the Randwick City Council area, certain minor works can go ahead as exempt or complying development, so the first question is which pathway fits your job.

Randwick City Council is the consent authority for Clovelly. It assesses demolition under the Randwick Local Environmental Plan 2012, which Council describes as the principal legal document controlling development across the City of Randwick, alongside the Randwick Comprehensive Development Control Plan 2013.

There are two main approval routes, and we will tell you which one fits before you commit to anything:

  • Complying development (CDC): where your demolition meets the standards of the NSW Codes SEPP Demolition Code, it can be approved as complying development. A Complying Development Certificate must be obtained before any demolition or excavation begins, and it is issued on a fast-track basis by Council or a private accredited certifier. Heritage items and properties in a heritage conservation area cannot use this route.
  • Development application (DA): anything that does not qualify goes to Randwick City Council as a DA. Since 1 July 2021, every application in the Randwick area is lodged through the NSW Planning Portal.

Lodging with the correct authority from day one keeps the approval moving. A Clovelly job sits with the City of Randwick, in Sydney’s Eastern Suburbs.

A little about Eco Demolition

Eco Demolition is a family-run business founded in 2015 by Adam A. Abbas, and we have completed over 1,000 demolition and site-preparation projects across Sydney. On a Clovelly job you deal with one contractor for the whole sequence: approvals, asbestos, demolition and site clearing, with a single point of contact from quote to handover.

We keep this page short on credentials on purpose. Our licence numbers, insurance and ISO certifications are listed in full on our main Sydney demolition page, so you can check them yourself.

Demolition Clovelly, NSW: Contractors and the Randwick City Council Approval Path

House demolition, strip-outs and site clearing in Clovelly

Most Clovelly enquiries are about clearing a site for something new: a full house demolition ahead of a knockdown rebuild, taken to a clean, level block. As demolition contractors working across Clovelly and the wider Randwick area, we also handle:

  • Partial demolition, where part of a home comes down and the rest stays standing
  • Internal strip-outs, back to the structural frame for a renovation or a commercial fit-out
  • Garage, shed and outbuilding removal, including slabs and footings
  • Swimming pool removal and site restoration
  • Site clearing, waste removal and bulk excavation to prepare the ground

Tight-access sites are part of the job. Where a machine cannot reach, our hand-demolition specialists take the structure down by hand, and we use non-destructive digging to locate services before anyone excavates. We do not just pull buildings down. We hand back a block that is ready to build on.

When Randwick City Council may ask for a geotechnical report

One requirement catches owners out on deeper jobs. Randwick City Council may ask for a geotechnical investigation report where excavation goes beyond 1.5 metres, where stormwater infiltration is proposed, or where its development engineers request one.

If your demolition is clearing the way for a new basement, a lower-ground level or a cut-in slab, the dig can easily pass that 1.5 metre mark. The report reads the ground conditions and shows the work can proceed safely without undermining what sits next door, so it is best planned early.

We flag it at the site assessment and price it in from the start, rather than letting it surface as a hold-up part way through.

Demolition Clovelly, NSW: Contractors and the Randwick City Council Approval Path

Asbestos, checked and cleared before demolition starts

Older homes can carry asbestos in sheeting, eaves and flooring, so a pre-demolition inspection comes first. If asbestos is found, it has to be removed and cleared before the structure comes down, never alongside it.

Our licensed team removes both bonded (non-friable) and friable asbestos. Bonded material is the sheeting and eaves you often see; friable asbestos is the loose, higher-risk material that calls for a Class A licence and stricter controls. For friable removal, the air monitoring and the clearance certificate are issued by an independent licensed asbestos assessor, whom we arrange and coordinate. We never sign off our own clearance, because that independence is what makes the certificate mean something.

Randwick City Council may also ask for an asbestos survey with a demolition proposal, under its own asbestos policy. We handle the removal, the safe transport and the compliant disposal, then hand you the clearance documentation for your records.

The seven steps we run, from quote to handover

We run every job to the same sequence, so you always know what is next:

  1. Initial contact and a free quote. Tell us the property and the plan; we give you a fixed-price quote in writing.
  2. Free site assessment. We look at access, structure, services and any asbestos, and confirm the approval route.
  3. Council approvals and permits. We prepare and manage the Randwick City Council DA or the CDC, and the certifier appointment.
  4. Safe asbestos removal and site preparation. Any asbestos is removed and cleared first, and services are disconnected.
  5. Demolition. The structure comes down safely, and we door-knock your neighbours beforehand so nobody on the street is caught off guard.
  6. Waste removal and site cleanup. Material is sorted for re-use and recycling where practicable, then the site is cleared.
  7. Final compliance certificates and handover. You get the paperwork and a construction-ready block.
Demolition Clovelly, NSW: Contractors and the Randwick City Council Approval Path

What goes into your fixed price

We do not price demolition off a rate card, because no two sites are the same. What shapes your quote is the size and construction of the building, how much asbestos is present, how tight the access is, whether there is a pool, slab or outbuildings to remove, how much material has to leave the site, and how deep any excavation goes.

Once we have seen the site, the figure we give you is fixed. Under our Fixed Price Guarantee, the price we quote is the price you pay: no hidden fees, no surprise variations. The quote is free, and we take the time to get it right rather than leave you chasing a moving number later.

Areas We Serve
Other Services Available in Clovelly

Demolition Clovelly: approval questions answered

These are the approval questions a Clovelly demolition tends to raise, answered from Randwick City Council’s own published process.

Do I always need council approval to demolish in Clovelly?

No. Certain minor works can proceed as exempt or complying development in the Randwick area. Anything beyond that needs a development application to Randwick City Council, and we confirm which applies at the site assessment.

Which council assesses a Clovelly demolition?

Randwick City Council, under the Randwick Local Environmental Plan 2012. A Clovelly property sits inside the City of Randwick, in Sydney's Eastern Suburbs.

Can I demolish under a CDC, or do I need a DA?

If the job meets the NSW Codes SEPP Demolition Code, it can be a complying development, signed off fast-track by Council or an accredited certifier. Heritage items and homes in a conservation area cannot use that route and need a DA.

What has to happen before demolition can start?

Where a DA or CDC applies, you need a Construction Certificate before any demolition or excavation, and a Principal Certifier appointed through the NSW Planning Portal. Utilities are disconnected first, and Council may require a bond to protect footpaths and kerbs.

When might Randwick ask for a geotechnical report?

Where excavation exceeds 1.5 metres, where infiltration is proposed, or where Council's development engineers request it, which most often applies to basement or deep-cut jobs.

Get your Clovelly demolition under way

Contractors and the Randwick City Council Approval Path. For Clovelly owners, done properly.

Get the council right and the rest of a Clovelly demolition follows: we will tell you whether it is a CDC or a Randwick City Council DA, price it as one fixed figure, and manage the approvals through to a construction-ready block. Call Eco Demolition on 02 9769 0050 to book your free site assessment.

Just Some of the Builders We Work With

Clarendon
Clover
Edenbraehomes Logo
Fairmont Homes Nsw Logo
Lily
Masterston
Montgomery
Hall & hart
Mcdonald Jones
Mericon
Wisdom Homes
Rawson
Sekisui
Eco Demolition

Start Your Demolition & Asbestos Removal Project Today

Get your free fixed-price quote within 24 hours.

    Upload File

    Supported formats: JPG, JPEG, PNG, PDF. Max file size: 10 MB.

    This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

    We value your privacy. Your information will only be used to prepare your quote.