Planning to knock down or strip out a property in Enmore and trying to work out which council rules apply? You are not imagining the confusion. Enmore sits in the Inner West, and the Inner West runs one planning map with more than one rulebook underneath it. Eco Demolition is a family-operated, licensed demolition contractor working across Enmore and the wider Inner West, and we take the approval maze off your hands: we tell you which pathway your job needs, prepare the paperwork, remove any asbestos under licence, and carry the demolition through to a clean, construction-ready site, all on one fixed price we put in writing first.

4.9
Customer Rating
0
Years Experience
0
Projects Completed
ISO-Certified / EPA NSW Compliant / Safework NSW Compliant

Trusted by Public Sector Clients

Licensed Demolition Contractor | Licensed Asbestos Removal | Residential, Commercial & Development Projects | SafeWork & EPA Compliant | Fully Insured

Demolition Enmore: One Contractor, and the Inner West Rulebook Handled

One LEP, three DCPs: the part that trips people up in Enmore

Here is the wrinkle that catches Enmore owners out. When the former Marrickville, Leichhardt and Ashfield councils merged into the Inner West, the council consolidated its Local Environmental Plan into a single instrument, the Inner West LEP 2022, that now covers the whole area. What it did not do is merge the Development Control Plans. There are still separate DCPs inherited from the former council areas, and Enmore sits in the former Marrickville area, so the former-Marrickville DCP is the one that governs the detail of a demolition here.

Why does that matter to you? Because the DCP is where the practical demolition controls live, the site management, waste, tree and notification requirements, and applying the wrong one wastes time. The reliable way to confirm exactly which controls attach to your address is the section 10.7 planning certificate, which you can order for the property. We read that certificate as part of scoping your job, so the plan we lodge matches the rules for your parcel, not a generic set.

The lodgement clock, and what happens after consent

Inner West Council tightened its lodgement process, and it now runs on a clock worth knowing before you apply. When a demolition application is lodged, the council checks it against a documentation requirement at lodgement. If something is missing, you get one chance to supply it inside a short window, and if the request is not met the application can be returned rather than assessed. There is also a short period to pay the fees once invoiced. Miss either and you are back at the start.

Consent is not the finish line either. A demolition in the Inner West typically carries post-consent obligations that owners forget to budget for: an asset-protection or road-and-footpath damage bond lodged with the council before work starts, developer contributions under section 7.11 or 7.12 where they apply, and a notice to the council a couple of days before demolition commences. We manage this timeline for you, so the approval, the bond, the notifications and the start date line up instead of tripping over each other.

Demolition Enmore: One Contractor, and the Inner West Rulebook Handled

The Enmore jobs we take on

Enmore is tight terraces, semis, warehouses turned into homes and small commercial frontages, so the work here leans to careful, access-constrained jobs rather than big open knockdowns. We cover the full range:

  • Full house demolition and knockdown-rebuild site preparation
  • Partial and internal demolition, including single wall removals to open up a terrace
  • Office, shop and warehouse strip-outs back to structure
  • Shed, garage and outbuilding removal
  • Site clearing, excavation and bulk earthworks for the new build

On narrow Enmore streets and shared-wall terraces, we use hand-demolition specialists and non-destructive digging where a machine cannot safely reach, and we door-knock the neighbours to explain what is coming before any work begins.

Asbestos comes out first, under licence

Enmore’s older housing stock means asbestos is common, usually in fibro sheeting, eaves, cement pipes or old flooring, and it has to be dealt with before the structure comes down, not during. Every job starts with a pre-demolition inspection. Where asbestos is found, our licensed removalists, certified for both friable and non-friable material, take it out under SafeWork NSW and NSW EPA rules and dispose of it at a licensed facility. For friable asbestos, the air monitoring and the clearance certificate are issued by an independent licensed assessor that we arrange and coordinate, so the sign-off is genuinely at arm’s length. Only once the site is cleared and certified does structural demolition begin.

Demolition Enmore: One Contractor, and the Inner West Rulebook Handled

Eco Demolition at a glance

Eco Demolition was established in 2015 and is run by founder Adam A. Abbas alongside a close family team of nine, with more than 1,000 projects completed across Sydney. We built the business on one idea: do demolition properly, do it safely, do it once. On an Enmore job that means one licensed contractor from the first site visit through approvals, asbestos and demolition to handover, so you are never left coordinating separate trades. You can see our full licensing, accreditation and insurance details on our Sydney demolition service page, which stands behind every Enmore job.

What an Enmore demolition costs

There is no single price, because no two Enmore sites are the same. Your cost is driven by the size and type of structure, the materials, whether asbestos is present, how much room a truck and machine have to reach a tight inner-west block, and the volume of waste to be carted and disposed of. Rather than guess, we assess your specific site and put a fixed price in writing. Under our Fixed Price Guarantee, the price we quote is the price you pay, with no hidden extras once work is under way. The quote is free.

Demolition Enmore: One Contractor, and the Inner West Rulebook Handled

How an Enmore demolition runs

Every job follows the same seven steps, so you always know what is next:

  1. Initial contact and a free, fixed-price quote.
  2. A free on-site assessment of the structure, access and materials.
  3. Council approvals and permits, handled by us.
  4. Licensed asbestos removal and site preparation.
  5. The demolition, carried out safely and to schedule.
  6. Waste removal, sorting and site clean-up.
  7. Final compliance certificates and a construction-ready handover.
Areas We Serve
Other Services Available in Enmore

Your Enmore demolition questions

Do I need a DA to demolish in Enmore, or can it be complying development?

It depends on the property. Some straightforward demolitions can be approved as complying development through an accredited certifier; others are assessed by Inner West Council as a development application. We work out which pathway your address qualifies for and handle the documentation either way.

Which Inner West DCP applies to my Enmore property?

Enmore is in the former Marrickville area, so the former-Marrickville DCP generally applies under the Inner West LEP 2022. The definitive answer for your parcel is on the section 10.7 planning certificate, which we review as part of your quote.

Do you remove asbestos as part of the demolition?

Yes. We inspect before any structure comes down and remove asbestos under licence to SafeWork NSW and EPA standards. For friable asbestos, an independent licensed assessor we arrange issues the clearance certificate before structural demolition starts.

Book an Enmore demolition quote

One Contractor, and the Inner West Rulebook Handled. That is the Enmore standard.

From a single wall to a full knockdown, one licensed team handles the Enmore approvals, the asbestos, the demolition and the clean-up, and hands your site back construction-ready. Call Eco Demolition on 02 9769 0050, Monday to Friday 7am to 7pm, for a free, fixed-price quote.

Just Some of the Builders We Work With

Clarendon
Clover
Edenbraehomes Logo
Fairmont Homes Nsw Logo
Lily
Masterston
Montgomery
Hall & hart
Mcdonald Jones
Mericon
Wisdom Homes
Rawson
Sekisui
Eco Demolition

Start Your Demolition & Asbestos Removal Project Today

Get your free fixed-price quote within 24 hours.

    Upload File

    Supported formats: JPG, JPEG, PNG, PDF. Max file size: 10 MB.

    This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

    We value your privacy. Your information will only be used to prepare your quote.